Description
The Bio-Pure Flowpath was developed for Commercial, Industrial or larger off sewage mains applications.
Key benefits:
- Easy to install
- Energy efficient air blower for lower running costs
- SAF technology with reliable performance
- Typical de-sludge period is approximately 12 months dependant on usage
How it works:
The Bio-Pure Flowpath commercial sewage treatment plant contains, a two stage primary settlement zone designed to settle coarse and non-biological loadings.
Sludge will build up in these zones and require moving periodically.
The Settled effluent will then discharge forward into the bio-zones. Each segment field contains a high percentage of filter media, where biological treatment performs, due to a high oxygen input.
Once treatment has taken place the multiple bio-zones, the effluent is discharged into the final humus tank, where it settles before flowing via the outlet.
Occasionally an amount of settled humus sludge is returned to the first primary zone.
Warranties:
2 year manufacturers warranty on all air compressors
25 year warranty on all GRP components
Pumped outlet option available on request.
Offloading is the responsibility of the customer