Rignel Hall – Bio-Pure and Reed Bed
Our client had spent as much with a builder on a new soak away which can be seen to have completely failed, as did they with us later to put in a proper system in. The problem was dirty water running within the proximity of a public foot path. The walk area now is clean. A Bio-pure 2 was installed after a large septic tank.
Contact us if you are interested in a reed bed.